FACTORY MODIFICATION WORKS PROJECT

  • STATUS : Completed
  • SCOPE OF WORK : Asphalt MEP and Finishing
  • BUILT UP AREA : 520 m2
  • LOCATION: Insutrial
  • DURATION: 2 months
  • STATUS:Completed
  • SCOPE OF WORK : Asphalt MEP and Finishing
  • BUILT UP AREA : 520 m2
  • LOCATION:Insutrial
  • DURATION:2 months